It's not totally complete, but it is in a usable condition. The Pilot is stopping for now since he will be on a long business trip. Final touches will be completed when he gets back. A few shelves & drawers
Wednesday, January 30, 2008
The closet to this point
Posted by JenniferB79 at 10:21 PM 2 comments
Labels: master bedroom, walk-in closet
Monday, January 21, 2008
Progress update on master bathroom/closet/bedroom
Click to view previous update.
It was hard getting a good picture of the layout, so I drew a before & after. They are not to scale.
We've paint the bathroom, closet & master bedroom. We also added new lighting fixtures above the sink. Also installed lighting inside the closet & vanity area. The bedroom & bathroom have been partially opened up to each other. New base boards are being put in & window & door casing. Here are a few up to date pictures. Oh the Pilot also raised the ceiling in the bathroom & closet. Popcorn was scraped from all the areas, too.
Wall 1. The squares are painted with the bathroom colors.
The Pilot extended the over hang slightly & added moulding.
Walls 2-4 are painted this color. The outside of the squares on wall 1 are also painted that color.
Sanded, just waiting to be stained.
Wall was knocked in half to create a pony wall.
New lights!!
Showing bathroom colors.
Vanity area
Lighting inside closet.
View from bedroom into bathroom. This was the part that was opened up.
Posted by JenniferB79 at 8:49 PM 1 comments
Labels: during, master bathroom, master bedroom
Subscribe to:
Posts (Atom)