Are finally done! Mr Pilot finished them up shortly after Thanksgiving. We are still in the process of moving furniture around between the rooms figuring out where we like things best. Baseboards still need to be installed, too. When we figure all that out I will take a better picture.
Wednesday, January 7, 2009
Downstairs floors
Posted by
JenniferB79
at
10:11 PM
0
comments
Labels: downstairs, flooring, hardwood
Friday, November 21, 2008
The master bedroom...
closet finally has a door!! YAY! The Pilot installed a bi-fold door & moulding. It really changes the look of things. Finishes it off. The inside still needs some finishing touches.
He also stained the vanity, the mirror trim & the medicine cabinet a chocolate brown. Oh & he moved the temporary flooring from the kitchen up to the bathroom area.
Posted by
JenniferB79
at
2:46 PM
0
comments
Labels: cabinets, closet, flooring, master bathroom, master bedroom
Installing hardwood floors
The Pilot has been busy installing hardwood floor down stairs. He's about half way done. It's quit the process. Two pictures below. 1) The floor he is installing. It's hand carved. 2) The surprise we discovered under the original hard wood in the entry way- ugly linoleum.
2 more rooms & a small hall to go & he'll be done.
Posted by
JenniferB79
at
2:35 PM
0
comments
Labels: downstairs, flooring, hardwood